Gas Generation & Carbon Capture – Nottinghamshire

The gas generation and carbon capture project in Worksop, Nottinghamshire represents a pioneering step forward in sustainable energy production. Set to begin generating electricity for thousands of homes by the second quarter of the year, the full facility will be operational by year-end.
This first-of-its-kind plant not only provides a cleaner, more efficient energy solution but also serves as a key hub for future research and development. The site supports the UK’s transition towards net zero, combining natural gas-powered engines with an innovative carbon capture system that converts flue gas into consumable, food-grade CO₂. This CO₂ can then be stored and supplied to the food and drink industry, turning emissions into a valuable resource.
First Connect Utility Solutions delivered significant gas infrastructure works to support the facility’s dual-generation and carbon capture capabilities.

Key Benefits
Future-proof infrastructure to support both energy generation and CO2 capture.
Precise, compliant installation meeting stringent technical and industrial standards.
Improved operational flexibility through dual metering for separate system.
Support for sustainability goals, enabling food grade CO2 production and reduced environmental impact.
Robust engineering solutions for a long MP route installation using proven open-cut methods.
Outcome
First connect successfully:
Our Approach

It All Starts With a consultation!
For any kind of queries, please call
01246 930 649
First Floor, Unit 36, Jessops Riverside, 800 Brightside Lane, Sheffield, S9 2RX
enquiries@firstconnect-utility.co.uk